Single Blog Title

This is a single blog caption

Stuck Pipe Prevention

We were delighted to be able to teach an extended 5 day Stuck Pipe Prevention Course to Pakistan Petroleum Ltd (PPL) in Karachi during the period 29 Nov – 04 Dec 2015 to 22 PPL delegates ranging from geological personnel through to drilling engineers and supervisors who are involved in difficult drilling operations throughout the country.

The reason why the typical 3 day course was extended to 5 days was because we covered the extra areas of tectonically and structurally stressed geological formations, which typically cause down-hole stuck pipe issues in Pakistan.  We are greatly appreciative of PPL’s marvellous hospitality whilst in Karachi and PetroSync’s organisational efforts.  We wish PPL every success on their future wells and the very best of luck to all our students!

Leave a Reply